Boroo Mine's Water Supply System Project
As part of the expansion and renovation of Boroo Gold LLC's main industrial water supply line, we planned and constructed the external water supply network in compliance with Facility BNbD 40-02-16 standards for water supply and sewerage systems, as well as Facility BNbD 3.05.04-90 norms. In 2020, we completed the construction design, fully renovated the plant's water supply network, and finalized installation work within one year, significantly enhancing production efficiency and economic performance. The project was entirely financed by Boroo Gold LLC. A 2,300-meter section of the main water supply line was replaced with D300 diameter high-pressure-resistant DICL (ductile iron pipe), designed for a lifespan of 50-100 years. To expedite material procurement, we collaborated with the top three global manufacturers, leveraging official business relations and partnerships. A professional team specializing in international transportation and logistics ensured prompt procurement of inventory. The project was successfully executed by a team of foreign experts and Mongolian consulting engineers, who carried out the installation in accordance with the manufacturer's guidelines and international standards.